Temporary Road Closures and Single Lane Traffic – Film Production Sept. 12-14

From September 12 – 14th, from approximately 7:00 a.m. – 10:00 p.m. Puppy Prep. Productions will be filming scenes for the TV series titled “Pup Academy”.  There will be temporary road closures up and certified traffic control personnel and production assistants to safely direct vehicular and pedestrian traffic safely around the film site locations. The majority of the work will be centred at Craig Street and Kenneth Street, extending a block out in each direction, and include City Square and Lois Lane.  Impacts will be intermittent (approx. 3 minutes).  The Production Crew will make every effort to ensure that as soon as they are done with the location that the parking will be opened up again. Businesses are OPEN.