RFP 2023-01: Preliminary Engineering for Water System Chlorine / UV Treatment
The City of Duncan is considering upgrades to the water system for the potential addition of system-wide chlorination and UV facilities. Installation of chlorine treatment is anticipated to occur first, with UV treatment as a future second phase. The treatment systems must be designed to improve each other’s performance when installed.
The 3 completed RFP Packages should be received by 2:00 p.m. April 18, 2023 to the following address:
Attn: Brian Murphy, Director, Public Works and Engineering
City of Duncan – City Hall
200 Craig Street
Duncan, BC V9L 1W3